Small and large jobs differ
A limited affected area may require a very different scope from an incident involving multiple rooms or removal of porous materials.
Assessment comes first
A reliable timeframe should be based on actual job details rather than a universal promise.
Access can affect timing
Property access, coordination with owners or managers, and the work required can all influence scheduling.